Map what exists
Identify panels, controllers, sensors, actuators, network links and the equipment they serve.
Turn the existing plant and the operating objectives into a practical controls project.
Building controls projects can involve ageing panels, incomplete drawings and equipment that has changed over time. A survey establishes the starting point before replacement hardware or new software is proposed. We discuss the plant, users, controls architecture and the practical constraints on working in an occupied building.
Identify panels, controllers, sensors, actuators, network links and the equipment they serve.
Document the operating sequences, control points, schedules, graphics and alarms required.
Consider access, isolations, temporary arrangements and the order in which systems will be commissioned.
The design should describe both hardware and behaviour. A controller can be correctly installed while a control sequence remains poorly matched to the building. Functional testing therefore follows the intended operating modes, interlocks, alarm conditions and operator actions. Building management and specialist plant teams need to be involved where their equipment or responsibilities are affected.
Use our guide to bring the existing controls, operating objectives and changeover requirements into the project brief.
Have a specific site or building in mind? Start with a conversation.
Talk to the teamPlant schedules, controls drawings, software and licence information, known faults and the current operating pattern are useful. We can discuss a discovery visit where records are incomplete.
A phased approach can be considered around plant dependencies, occupancy and access. The retained equipment and temporary arrangements need to be part of the plan.